NE 153rd Place - Safe Routes to School

Staff Contact


Kent Vaughan
Senior Civil Engineer
(425) 398-8900
 
Current Status:

Design/Permitting: Complete

Construction: July - Oct 2019 (after school is out for summer)

*In advance of construction, PSE is relocating a gas main at two locations in NE 153rd Place right-of-way between Juanita Drive NE and 70th Ave NE that conflict with the proposed sidewalk improvements. PSE's work will continue through March 5th, 2019. During the PSE's work, the shoulder on the south side of the road is closed to pedestrians. Pedestrians are directed to cross the NE 153rd Place at 70th Ave NE and use the sidewalk on the other side of the street. For the people in between 70th Ave NE and the work zone, the contractor has a flagger watching out for pedestrians and will escort them through the work zone as needed.

 
Background:

As part of the City’s 2015-16 Neighborhood Transportation Plan program, the City held two public meetings with citizens in the Arrowhead Elementary School neighborhoods.  In these meetings, citizens were asked to provide public comment on traffic, pedestrian and cyclist safety concerns and improvements.  One of the top safety concerns identified was the narrow shoulder with undefined driveways along the south side of NE 153rd Place which serves as the primary route for walking students attending Arrowhead Elementary school, east of Juanita Drive NE.  Based on this feedback, the City submitted a grant proposal in 2016 to develop sidewalk along NE 153rd Place through the Washington State Department of Transportation (WSDOT)’s Safe Route to Schools program.  WSDOT awarded a grant to fund this sidewalk project in June 2017. 

  

Project Description:

The purpose of this project is to provide a safe, comfortable pedestrian facility along NE 153rd Place for children and the public to access Arrowhead Elementary School.  The project includes the design and construction of curb & gutter, sidewalk, curb ramps, angled parking, paving, driveways, storm drainage, landscaping, irrigation and cast-in place feature wall along the south side of NE 153rd Pl between Juanita Drive NE and 70th Avenue NE.

 

Funding:

This project is funded by the WSDOT Safe Route to School program (90%) and the City of Kenmore (10%).

 

WSDOT Safe Route to School funds: $673,594

City funds: $76,354

 

 

 